LHCb Run 2 trigger and upgrade reconstruction
M. Whitehead*
on behalf of the LHCb collaboration*: corresponding author
Published on:
August 02, 2019
Abstract
The LHCb trigger strategy for Run II (2015--2018) and the upgrade era from Run III (2021) onwards are discussed. A crucial aspect of the LHCb upgrade is the removal of the hardware trigger, so LHCb will move to a fully software based trigger. The latest studies and progress from the upgrade tracking and reconstruction sequence, that will form the basis of the upgrade trigger, are presented.
DOI: https://doi.org/10.22323/1.340.0225
How to cite
Metadata are provided both in
article format (very
similar to INSPIRE)
as this helps creating very compact bibliographies which
can be beneficial to authors and readers, and in
proceeding format which
is more detailed and complete.