PoS - Proceedings of Science
Volume 340 - The 39th International Conference on High Energy Physics (ICHEP2018) - Plenary
SuperKEKB status—Belle II physics run started
K. Akai*  on behalf of the SuperKEKB accelerator group
Full text: pdf
Published on: August 02, 2019
Abstract
SuperKEKB, a 7-GeV electron -- 4-GeV positron double-ring collider, was constructed by upgrading KEKB to significantly push the luminosity frontier toward more detailed experiments seeking new discoveries in physics beyond the Standard Model. The design luminosity of SuperKEKB is 8x10^{35} /cm^{2}s, 40 times higher than that achieved in KEKB. The major part of the gain results from significantly decreasing the beam sizes at the interaction point based on the nanobeam collision scheme; the design beam currents in both rings are double those achieved in KEKB. Large-scale construction for the upgrade started in 2010. After the Phase 1 beam commissioning for the upgraded rings without beam collision conducted in 2016, renovation of the interaction region, including the installation of the final-focus superconducting magnets and the Belle II detector was conducted. After completing the construction of SuperKEKB, beam tuning for collision and physics data taking by the Belle II detector started in 2018. SuperKEKB started physics run operation, pioneering luminosity frontier. In this paper, the design, construction, and beam commissioning of SuperKEKB are reviewed, mainly focusing on the accelerator.
DOI: https://doi.org/10.22323/1.340.0701
How to cite

Metadata are provided both in "article" format (very similar to INSPIRE) as this helps creating very compact bibliographies which can be beneficial to authors and readers, and in "proceeding" format which is more detailed and complete.

Open Access
Creative Commons LicenseCopyright owned by the author(s) under the term of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.