PoS - Proceedings of Science
Volume 369 - The 21st international workshop on neutrinos from accelerators (NuFact2019) - Working Group 3
J-PARC Neutrino Beamline and 1.3 MW Upgrade
Y. Oyama*  on behalf of the T2K neutrino beamline group
Full text: pdf
Published on: June 11, 2020
Abstract
J-PARC neutrino beamline has been operated since 2009. Until May 2018, the maximum beam power achieved was ~500 kW. In future, the beam power will be upgraded to 1.3 MW. After the stable operation in late 2020s, we can accumulate ~30 x 10^20 POT data per year. It is almost the same number as total POT accumulated in recent 10 years. The upgrade plan of the Main Ring as well as the neutrino beamline is reported.
DOI: https://doi.org/10.22323/1.369.0054
How to cite

Metadata are provided both in "article" format (very similar to INSPIRE) as this helps creating very compact bibliographies which can be beneficial to authors and readers, and in "proceeding" format which is more detailed and complete.

Open Access
Creative Commons LicenseCopyright owned by the author(s) under the term of the Creative Commons Attribution-NonCommercial-NoDerivatives 4.0 International License.