Upgrades of the ESSnuSB design to comprise a nuSTORM facility and Muon Collider Proton Complex Test Facility
Published on:
March 31, 2022
Abstract
The high beam power 5 MW of the ESS 2 GeV linac can be used to produce uniquely intense low energy neutrino and muon beams. The results of a design-study of an ESS based neutrino Super Beam, ESSnuSB, is reported elsewhere in these proceedings. Here we propose design-studies of how to complement the ESS linac, which is currently under construction, and the ESSnuSB accumulator ring, for which a design has already been made, to achieve a Low Energy nuSTORM facility for the measurement of neutrino cross-sections below 0.5 GeV and search for sterile neutrinos and a Proton Complex test facility for the demonstration of the feasibility of compression of each of the 2.86 ms ESS linac proton pulses of ca 1015 protons to about 2 ns as required for a Muon Collider.
DOI: https://doi.org/10.22323/1.402.0020
How to cite
Metadata are provided both in "article" format (very similar to INSPIRE) as this helps creating
very compact bibliographies which can be beneficial to authors and
readers, and in "proceeding" format
which is more detailed and complete.